Before & AfterKitchen Water Damage Restoration
Water-damaged subfloor, peeling underlayment, and exposed wallboard dried, repaired, and finished with a full hardwood floor install and clean wall surfaces throughout the kitchen.
Projects
Ceiling and electrical repair, full kitchen rebuilds, countertops and lighting, and bathroom vanity finishes — every photo below is work completed by Conclusive Restoration for property owners across the Inland Empire.
Before & AfterWater-damaged subfloor, peeling underlayment, and exposed wallboard dried, repaired, and finished with a full hardwood floor install and clean wall surfaces throughout the kitchen.
Before & AfterGut-level kitchen rebuild from exposed studs, concrete slab, and temporary utility sink to a complete dark-cabinet kitchen with stainless appliances, quartz counters, and recessed lighting.
Before & AfterOutdoor patio construction zone restored with finished stone outdoor kitchen and fireplace, seating area, and completed electrical access panel with finished stone base.
Before
AfterOpen ceiling framing, temporary fluorescent lighting, and unfinished electrical runs restored with a finished ceiling and modern recessed LED lighting throughout the kitchen.
Before
AfterDated oak cabinets, tile counters, and an aging dishwasher replaced with white shaker cabinetry, quartz-look counters, a stainless dishwasher, and a modern pull-down faucet.
Before
AfterSecondary kitchen wet-bar run with worn oak cabinets and tile counters rebuilt to match the main kitchen — white cabinetry, continuous stone counters, and a clean finished layout.
Before
AfterDamaged exterior wall beside the stone entry column repaired and refinished — stucco patched, paint matched, and the patio approach restored to a clean, finished exterior.
Before
AfterSevere interior water and mold damage with torn containment and debris removed; wall cavities cleaned, insulated, and prepped for drywall with wiring secured and cavity ready for close-up.
Before
AfterOpen ceiling with exposed joists, ductwork, and insulation restored — drywall closed, texture matched, and the room returned to a clean finished ceiling with only the final duct access remaining.
Before
AfterLarge areas of failed exterior stucco stripped and rebuilt — walls re-stuccoed, color-matched, and finished for a uniform, weather-tight exterior on the full elevation.
Damage doesn't wait. Neither do we — our certified crew responds 24 hours a day, 7 days a week across the Inland Empire.